Monthly Archives: January 2015

DIY Streets – Stepney Bank January 2015 update

Following feedback from the street trial in November we’ve developed a second option for Stepney Bank, which keeps the two-way access.

The idea with the two-way design is to widen the footpath at the main pinch-points, create public space at the top of the bank and have identified parking bays to avoid cars bumping onto the pavement. This will involve some give-way sections which should help reduce vehicle speeds.

Both of the options are shown below – please let us have your thoughts on these by contacting Cath at diystreets@ouseburnfutures.org.uk

Stepney Bank Two Way

Stepney Bank One Way